Industry · Construction

Keep on top of complex construction projects

Construction is a uniquely project-oriented sector that requires businesses to make significant investment upfront and carefully manage cash flow through uncertainty to unlock returns over the long term. This brings with it a range of specific challenges in terms of budgeting, forecasting, scenario planning and asset utilization – challenges that don’t affect any other sector.

To meet these challenges head on, construction companies must utilize Financial Planning & Analysis (FP&A) software that can enable better decision-making through nuanced analysis, dynamic forecasting and maximize Return on Investment (ROI) on a risk-adjusted basis.

Construction

Common challenges

Challenge 01

Cash flow planning

The cash flow curve in construction can be extreme, requiring careful management to avoid liquidity concerns.

The challenge

Large upfront investment

For most construction projects, a large upfront investment is required to get the project off the ground. This upfront cost can typically only be recouped over the long term, resulting in a cash crunch that, if not managed effectively, can cripple your business’s operational capabilities. Managing treasury and dealing with financing options requires good foresight.

The consequence

Cash flow crunch

Without requisite planning and risk mitigation processes, a single departure from the stated plan can place a company in a cash crunch that means they can’t pay suppliers or workers on time. This liquidity crunch can force costly borrowings, or even place the company’s existence in jeopardy.

The Cubewise solution

Nuanced cash flow planning

Cubewise and IBM Planning Analytics / TM1 offer a powerful suite of tools for advanced cash flow planning that can help construction companies manage their risk and avoid liquidity problems entirely.

Capability · Scenario planning →

Challenge 02

Feasibility studies

The challenge

Managing risk and reward

Construction projects are long term, they come with plenty of fixed costs and they’re very difficult to get out of if things go wrong. As such, management must do their diligence and calculate whether the ROI is worth the effort, considering all factors including internal constraints, macro-economic factors, client relationships and more.

The consequence

Negative returns

It’s not unheard of for a construction project to lose money due to unexpected delays, problems in the construction process, exchange rate fluctuations or any number of other factors. Feasibility studies are crucial to identify these factors upfront and understand risks in detail before embarking on any new project. Without this your margins and returns remain fragile.

The Cubewise solution

Sophisticated forecasting

Cubewise and IBM Planning Analytics / TM1 offer highly sophisticated forecasting capabilities that enable dynamic and precise feasibility studies to be performed.

Capability · Driver-based forecasting →

Challenge 03

Asset utilization

The challenge

Resource optimization

Construction projects require careful optimization of resources across machinery, contractors, labor and technology. Within various constraints, companies must plan how they use these assets in parallel so as to eliminate idle time and bottlenecks that can slow down building progress.

The consequence

Wasted time and resources

When assets aren’t utilized effectively, they create dead space and time. In extreme cases, over-reliance on specific assets can cause breakdowns and ongoing maintenance concerns. All of this places further pressure on margins, hurts relationships with clients and eats away at project ROI.

The Cubewise solution

Integrated asset utilization

Cubewise and IBM Planning Analytics / TM1 offer a truly integrated financial system that brings together key financial information and operational data for optimal asset utilization.

Capability · Unified planning →

How we work

  1. 01 · ConnectConnect your data.
  2. 02 · DefineDefine model drivers, planning scenarios, and business hierarchies.
  3. 03 · DeployDeploy a tailored user experience to every stakeholder.
  4. 04 · SustainContinuous support and life-long learning.
Our four-step delivery model

Start a project

A sophisticated planning system for all your construction needs

Let’s take this journey together

Talk to us today and let’s overcome the challenge together.